We run Minecraft Version 1.12.2
Page 3 of 3 FirstFirst 123
Results 21 to 23 of 23
  1. #21

    Exterior is all done! Just waiting on a World Map update, but in the mean time, here's a picture of the finished control bridge.


  2. #22

    Here's a look at the full length of the ship with the exterior completed via World Map.


  3. #23

    Back to work on this baby!!

    Here is the first hanger bay out of 2 to be done. This hanger bay in the picture is near completion.


Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  



All times are GMT. The time now is 01:08 PM.    Powered by vBulletin
Copyright © 2019 vBulletin Solutions, Inc. All rights reserved.
Privacy Statement Terms of Use